snippet:
|
Inundation restriction area for proposed building work |
summary:
|
Inundation restriction area for proposed building work |
accessInformation:
|
|
thumbnail:
|
|
maxScale:
|
5000 |
typeKeywords:
|
[] |
description:
|
<DIV STYLE="text-align:Left;"><DIV><DIV><P><SPAN>For proposed building work, any habitable building should have a floor level not less than 0.3 m above the potential inundation level. Building platform level should be no lower than Elevation level with in close prozimity of the lake. Elevation in metres (M</SPAN><SPAN>o</SPAN><SPAN>turiki Datum)</SPAN></P><P><SPAN>See RDC TRIM Record IT-247 - </SPAN><SPAN>"PIM - Processing Sheet Conditions" - </SPAN><SPAN>Section 302 Parts J - O</SPAN></P></DIV></DIV></DIV> |
licenseInfo:
|
|
catalogPath:
|
|
title:
|
Vector.DBO.Inundation_Restriction_poly |
type:
|
|
url:
|
|
tags:
|
["Inundation"] |
culture:
|
en-NZ |
portalUrl:
|
|
name:
|
|
guid:
|
|
minScale:
|
150000000 |
spatialReference:
|
|